Bando 2B61 Power King Combo 2 Rib

Regular price $ 34.12
Tax included. Shipping calculated at checkout.
Description

Bando 2B61 Power King Combo 2 RibBando 2B61 To resolve problem applications where belts are flipping over or jumping out of the sheaves, utilize Bandos series of Combo belts. The tie band assures lateral rigidity and guides the belts into the sheave grooves. The tie band, reinforced with high strength transverse tensile cords, is fully oil and heat resistant and permanently welds the individual belts together. Combos utilize the premium quality Power King and Power Ace belts, with

lb Locked rotor torque 270 % Breakdown torque 290 % Locked rotor time 39s (cold) 22s (hot) Moment of inertia (J) 20

0 V @ 60 HZ XP Class and Group None XP Division Not Applicable Agency Approvals CCSAUSEEV Ambient Temperature 40 °C Auxillary Box No Auxillary Box Base Indicator Rigid Bearing Grease Type Mobil SHC 220 (Athens Only) Constant Torque Speed Range 15-60 Current @ Voltage 133

0 V @ 60 HZ XP Class and Group None XP Division Division II Agency Approvals CCSAUSEEV Ambient Temperature 40 °C Auxillary Box No Auxillary Box Base Indicator Rigid Bearing Grease Type Polyrex EM (-20F +300F) Constant Torque Speed Range 15-60 Current @ Voltage 70

SHUNT Frame Prefix MC Heater Indicator No Heater Insulation Class F IP Rating NONE Lifting Lugs Standard Lifting Lugs Mounting Arrangement F2 Service Factor 1

Bando - 370DH075G The extra durable

Bando - 860DH300G Synchro-Link® Double Sided Timing Belts provide smooth

74 KG20 IC411 APRV-CSA Y Performance

75 Ohms B Ph Start Configuration DOL Break-Down Torque 4

39 % Rated voltage 200 V Rated current 40

25 MOUNTING RIGID MOTOR TYPE FHP OPPOSITE END BEARING 6205 SHAFT END BEARING 6203 AMBIENT 40 ROTATION CCW LEAD END REV SERVICE FACTOR 1

Bando - 100-S5M-2000 HP Anticipating the demand for energy savings and higher horsepower transmission

Catalog Number IDCSWDM3538 Enclosure TENV Frame 56C Frame Material Stainless Steel Frequency 60

Easy Shipping

Quick Dispatch:

Your Bando 2B61 Power King Combo 2 Rib orders ship within 1-2 business days.

Delivery Options:

  • Standard: 3-7 business days
  • Fast: 2-3 business days
  • Express: 1-2 business days

Order Tracking:

You'll receive a tracking link by email once your Bando 2B61 Power King Combo 2 Rib ships.

Need Help?
Questions about Bando 2B61 Power King Combo 2 Rib, sizing, or delivery? We're just an email away.

Live Shipping Estimates:
Enter your location at checkout to see available shipping methods and costs for Bando 2B61 Power King Combo 2 Rib in your area.

Get Shipping Estimates

You may also like

recommand products

{{{showcase_5_name}}}

US$ {{{showcase_5_price}}}

Min. order: 1 piece

{{{showcase_5_star}}} ({{{showcase_5_reviews}}} reviews)

Sold : Login>>

{{{showcase_6_name}}}

US$ {{{showcase_6_price}}}

Min. order: 1 piece

{{{showcase_6_star}}} ({{{showcase_6_reviews}}} reviews)

Sold : Login>>

{{{showcase_7_name}}}

US$ {{{showcase_7_price}}}

Min. order: 1 piece

{{{showcase_7_star}}} ({{{showcase_7_reviews}}} reviews)

Sold : Login>>

{{{showcase_8_name}}}

US$ {{{showcase_8_price}}}

Min. order: 1 piece

{{{showcase_8_star}}} ({{{showcase_8_reviews}}} reviews)

Sold : Login>>

{{{showcase_9_name}}}

US$ {{{showcase_9_price}}}

Min. order: 1 piece

{{{showcase_9_star}}} ({{{showcase_9_reviews}}} reviews)

Sold : Login>>

{{{showcase_10_name}}}

US$ {{{showcase_10_price}}}

Min. order: 1 piece

{{{showcase_10_star}}} ({{{showcase_10_reviews}}} reviews)

Sold : Login>>